Trawlercat 36 Owner Manual Contents
The original Endeavour Trawlercat Owner Manual was first published in 2004. Now in 2006 with 33,000 mile of experience and extensive feedback from owners who purchased the combined TC36 & TC44 manual we have revised the manual and published a unique manual for the TC36. The Table of Contents below provides information as to what is covered. The hyperlinks allow a photo reduced of sample pages.
Contents
| List of Figures and Tables | iii | |
| Introduction | iv | |
| Chapter 1. Engines | 1 | |
| First 50 Hours of Engine Operation | 1 | |
| Engine Start, Warm Up and Running Recommendations | 1 | |
| Recommended Maintenance Schedule For JH Engines | 2 | |
| Lube Oil Pressure—Additional Alarms | 2 | |
| Running On One Engine | 2 | |
| Drip Free Oil Filter Changes | 3 | |
| Loss of High End RPM | 4 | |
| Turbocharger Blower Wash | 4 | |
| Oil Dipstick 101 | 4 | |
| Chapter 2. Fuel System | 5 | |
| Fuel Tank Construction | 5 | |
| Fuel Tank Capacity | 5 | |
| Fuel Filters | 6 | |
| Fuel Burn Rates | 6 | |
| Fuel Polishing | 6 | |
| Chapter 3. DC Electrical System | 8 | |
| Electrical Panel | 8 | |
| DC Power Overview | 8 | |
| Power Posts | 9 | |
| Alternator Charging | 9 | |
| Starter Battery shut off Switch | 10 | |
| Engine Battery Parallel Switch | 10 | |
| Battery Charger | 11 | |
| House and Starting Batteries | 11 | |
| Battery Combiner | 12 | |
| Solar Panel Charging | 12 | |
| Generator DC Circuit | 13 | |
| Inverter DC Circuit | 13 | |
| Windlass | 13 | |
| 12 Volt DC System Panel | 14 | |
| Always on DC Circuits | 14 | |
| Cockpit DC Panel | 14 | |
| Battery Monitor | 15 | |
| Negative Bus Bar Connections | 15 | |
| Chapter 4. AC Electrical System | 16 | |
| 120 Volt AC System | 16 | |
| AC Source Selection | 16 | |
| Reverse Polarity | 16 | |
| 120 Volt AC System Panel | 17 | |
| Inverter Isolator and Transfer Switch | 17 | |
| Inverter Operation | 18 | |
| 120 Volt Electrical Outlets | 18 | |
| Chapter 5. Zincs and Galvanic Corrosion | 19 | |
| Engine Zincs | 19 | |
| Galvanic Isolator | 19 | |
| Bonding | 19 | |
| Extra Zinc Protection While Inactive | 20 | |
| Chapter 6. Plumbing | 21 | |
| Pressurized Freshwater System | 21 | |
| Hot Water Heater | 21 | |
| Hot Water Heating Using Engine Heat | 22 | |
| Vented Loop (for underwater exhaust only) | 22 | |
| Waste Line Maintenance | 22 | |
| Bilge Pumps | 23 | |
| Raw Water Strainers | 23 | |
| Legal for Lake Champlain Modification | 24 | |
| Chapter 7. Other Equipment | 25 | |
| Generator | 25 | |
| Air Conditioning | 25 | |
| Appendix | 26 | |
| A. Engine Break-In Procedure | 26 | |
| B. JH Maintenance Schedule | 28 | |
| C. Appliance Watts, AC Amps, DC Amps | 30 | |
| D. 4JH3-DTE Engine Performance: rpm/gph, rpm/mph | 31 | |
| E. JH Engine Specifications | 32 | |
| F. Circuit Fuses | 33 | |
| G. Extend Absence Shut Down Check List | 34 | |
| H. Vessel Registrations | 35 | |
| MMSI Registration | 35 | |
| User Fee Decal Program For Return From a Foreign Country | 35 | |
| I. TC36 Sling Points | 35 | |
| J, Winterization | 36 |
A four page matrix of ICW distances is also Included. Click to see a sample page.
Visitors
Visitors